PULLPUSH STUDIO

Construction of a recording room on the second floor of PullPush Studios. The room was held in an old warehouse that was located on the top floor of the premises. We carry out the work of acoustic insulation, acoustic conditioning, audio wiring and electrical wiring. How it looks on the charts, the results are very good.

Start Date: July 19, 2017

End Date: September 18, 2017

Location: Madrid

Website: Www.pullpushstudio.com

Manuel Vázquez